Re: (erielack) Steamtown Images--August 7, 2017--X Series (X2203-X2207) IDs



I can not confirm the locations, although I believe they are correct.
Others feel free to confirm or correct.  Only thing I would add to all is
that it's all part of the elevation construction.

X2203--Brick Church, NJ-- *Elevation construction*, Harrison Street
Bridge-- [1921.10.19]
X2204--Brick Church, NJ-- *Elevation construction*,  [1921.10.19]
X2205--Brick Church, NJ-- *Elevation construction* [1921.10.19]
X2206--East Orange, NJ-- *Elevation construction*, Retaining Wall--Halsted
Street [1921.10.19]
X2207--East Orange, NJ-- *Elevation construction*, Retaining Wall--Halsted
Street [1921.10.19]

Bob Bahrs

On Mon, Aug 7, 2017 at 7:47 AM, McKnight, Richard <pat_mcknight_@_nps.gov>
wrote:

>
>
>
> http://lists.railfan.net/listthumb.cgi?erielack-08-07-17
>
> X2203.jpg (image/jpeg, 2892x2318 852843 bytes, BF: 7.86 ppb)
> X2204.jpg (image/jpeg, 2952x2340 1037188 bytes, BF: 6.66 ppb)
> X2205.jpg (image/jpeg, 2950x2379 1026278 bytes, BF: 6.84 ppb)
> X2206.jpg (image/jpeg, 2944x2379 1115970 bytes, BF: 6.28 ppb)
> X2207.jpg (image/jpeg, 2950x2384 1188594 bytes, BF: 5.92 ppb)
>
>
>
> X2203--Brick Church, NJ--Harrison Street Bridge--Construction [1921.10.19]
> X2204--Brick Church, NJ--Construction [1921.10.19]
> X2205--Brick Church, NJ--Construction [1921.10.19]
> X2206--East Orange, NJ--Retaining Wall--Halsted Street [1921.10.19]
> X2207--East Orange, NJ--Retaining Wall--Halsted Street [1921.10.19]
>